Delivery · daily site reports

A photo a day, read for risk.

Each site sends one progress photo a day. AI checks it against the programme, today's deliveries and open RFIs. It tells you whether the job is on time, flags risks and drafts the daily report.

2/4
Sites with today's photo
1
High risks flagged today
1
Jobs behind programme
8
Reports on record
AI-drafted · confirmed by site
No photo yet todayOn programme
Fred Bakery
Joinery & 2nd fix · Dave Collins
10 days
Ahead · 1d
Zahter Restaurant
Finishes & decoration · Sam Okoye
10 days
Watch: The bar soffit is left open while VO-08 (feature lighting) waits for sign-off.
Behind · 3d
Holland Park Gardens
Structure & envelope · Priya Shah
10 days
High risk: There's a gap in the edge protection at the first-floor rear extension, next to the open elevation.
No photo yet todayOn programme
Ebebek — Store Rollout
Fixtures & 2nd fix · Kofi Mensah
10 days
Holland Park Gardens · today
📷

Today's progress photo

Holland Park Gardens · checked against programme, deliveries & risk
✦

Latest report

Mon 02 Nov · Priya Shah
Project →
On time?Behind · 3d
DeliveriesAll on site
Risks flagged3 · 1+ high

The rear extension frame is up to first-floor level with membrane on three elevations. The rear elevation is still open to the weather. Plasterboard from this morning's drop is stacked outside the front door.

Programme · Structure & envelope
The look-ahead had the envelope watertight by today. The rear elevation is still open, so the job is about 3 working days behind, and the extra gang is pushing labour over allowance.
Deliveries checked against today's runs
On site
Plasterboard ×60 + CLS
Delivered 08:20 by Jas (KR-1). It's stored outside and uncovered.
On site
Insulation + membrane
Delivered 09:50 by Marek (KR-2).
Risks the AI spotted
highsafety
There's a gap in the edge protection at the first-floor rear extension, next to the open elevation.
→ Stop work in that zone and reinstate the guardrail before anyone goes up. Log it as a near miss.
mediumweather
Plasterboard is stored outside with no cover, and rain is forecast from 15:00.
→ Move it inside the ground floor or sheet it over before lunch.
mediumprogramme
The envelope isn't watertight, which holds up 1st fix and adds labour cost.
→ Close RFI-006 with Ashcombe and re-sequence the rear elevation first.
6 operatives visible · Overcast, dry — rain forecast from 15:00 · 79% confidence · AI-drafted, confirmed by site
Site diary · Holland Park Gardens
Monday 2 NovBehind · 3d3 risks
The rear extension frame is up to first-floor level with membrane on three elevations. The rear elevation is still open to the weather. Plasterboard from this morning's drop is stacked outside the front door.
Priya Shah · AI-drafted, confirmed by site
Friday 30 OctBehind · 2d1 risk
Membrane is on the side elevations and the rear frame is going up.
Priya Shah · AI-drafted, confirmed by site
Thursday 29 OctBehind · 1d
Groundworks are backfilled and the first-floor joists are in.
Priya Shah · AI-drafted, confirmed by site